Public Participation First Information Announcement for the Environmental Impact Assessment of the Expansion Project for Metal Surface Treatment and Transformer Production by Yunnan Electric Power Equipment Co., Ltd.
Public Participation First Information Announcement for the Environmental Impact Assessment of the Metal Surface Treatment and Transformer Production Expansion Project of Yunnan People's Electric Power Equipment Co., Ltd.
1. Explanation
Yunnan Jiayan Environmental Engineering Co., Ltd. was entrusted by Yunnan People's Electric Power Equipment Co., Ltd. to carry out the environmental impact assessment work for the metal surface treatment and transformer production expansion project on October 8, 2022. In accordance with national and local regulations, public participation in the environmental impact assessment is being conducted to promote effective environmental protection work for this project.
2. Overview of the Construction Project
(1) Project Name: Metal Surface Treatment and Transformer Production Expansion Project of Yunnan People's Electric Power Equipment Co., Ltd.
(2) Project Location: Plot B-5-3, Kunming New City High-tech Industrial Base
(3) Industry: C3829 Other Manufacturing of Power Distribution and Control Equipment
(4) Project Nature: Expansion
(5) Project Construction Content: A new metal surface treatment workshop and transformer casting workshop will be added within the existing transformer production workshop in the factory area. The metal surface treatment will use a tin plating process, and the transformers will be cast with resin.
(6) Brief Introduction of Existing Construction Content and Environmental Protection Measures:
1. Overview of Existing Projects: There is a one-story transformer production plant, a one-story spray painting workshop, a 17-story office building, a 17-story shift dormitory building, and auxiliary facilities; currently producing 2000 transformers, 3000 environmentally friendly medium-voltage gas-insulated switchgear, and 720 transformers annually.
2. Main Environmental Protection Measures: For welding smoke dust, there are 5 mobile fume hoods + dust purifiers; for casting baking and vacuum casting exhaust gas, there are flue gas collection pipes + activated carbon adsorption devices + exhaust pipes; for spray dust and exhaust gas, integrated equipment is used with complete sealing, spray dust filter cartridges + activated carbon adsorption devices + exhaust pipes; exhaust gas from the spray painting workshop is treated through a closed spray painting room + two-stage activated carbon series adsorption (95%) + exhaust pipes; domestic sewage is treated through a septic tank before being discharged into the park's sewage pipeline; production wastewater is recycled and not discharged; general solid waste is collected and sold externally, hazardous waste is collected and temporarily stored before being regularly disposed of by qualified units.
3. Overview of the Construction Unit
(1) Construction Unit Name: Yunnan People's Electric Power Equipment Co., Ltd. (2) Construction Unit Address
(3) Contact Person of the Construction Unit: Zhao Xinmin
(4) Contact Information of the Construction Unit: 13888517219
4. Overview of the Environmental Impact Assessment Agency
(1) Name of the Environmental Assessment Agency: Yunnan Jiayan Environmental Engineering Co., Ltd.
(2) Address of the Environmental Assessment Agency: Room 2208, Building 5, Run Cheng First Avenue, Xishan District, Kunming City, Yunnan Province
(3) Contact Person of the Environmental Assessment Agency: Yang Chaolai
(4) Contact Information of the Environmental Assessment Agency: 18788408452
5. Public Participation Procedures and Main Work Content for Environmental Impact Assessment
The environmental impact assessment work procedure consists of three stages: the first stage is preparation, the second stage is formal work, and the third stage is report preparation.
Main work content includes studying and analyzing relevant documents, investigating environmental status, project analysis, impact prediction and evaluation, evaluation of environmental protection measures, and conclusions of environmental impact assessment.
6. Main Matters for Soliciting Public Opinions
1. Scope of soliciting public opinions
Representatives of citizens, legal persons or other organizations affected by the construction project.
2. Main matters for soliciting public opinions
(1) Understanding level of the project and awareness level of its environmental impact;
(2) After understanding the construction project situation from an environmental protection perspective, what attitude does the public hold towards this project's construction;
(3) Possible new environmental issues that may arise after the project is completed;
(4) Other opinions and suggestions regarding project construction.
3. Link to public opinion form: Public opinion form download address: https://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
7. Main Ways for the Public to Submit Opinions
The public can submit written opinions to the construction unit or its entrusted environmental impact assessment agency via letter, fax, email or other methods as required by relevant announcements after public participation information is released.
8. Validity Period for Information Release
The period for soliciting public opinions for this project is within ten working days from the date this announcement is published.
Related information

On May 31, the Kunming Small and Medium-sized Enterprises Digital Transformation Pilot Conference was grandly held at the Yunshang Digital Empowerment Industrial Park in Panlong District. The conference, themed 'Intelligent Start for the Future, Digital Leadership for Development', was jointly guided by the Kunming Municipal Bureau of Industry and Information Technology and the People's Government of Panlong District, Kunming. It was hosted by the Kunming Small and Medium-sized Enterprises Digital Transformation Promotion Center, Huawei Cloud Computing Technology Co., Ltd., and Kingdee Software (China) Co., Ltd.